Factory-built. Commissioned in days, not months.
A complete sewage treatment plant built in our own works as a factory-finished, skid-mounted unit in MS Epoxy-Painted (MSEP) construction. It arrives on site as one piece, needs only a foundation and services, and can be commissioned in days rather than months.
Click any vessel to read what it does.
The shared frame makes the internal compartments unmistakable, while the tertiary filter bank remains visibly separate and serviceable.
Floating carriers and coarse-bubble diffusers provide compact biological treatment.
Follow the numbered train from inlet to treated-water reuse. Click any stage for its engineering note.
Integral pre-treatment compartment within the skid.
Built and tested in the works while civil work proceeds on site — no wet civil trades on the critical path.
Fabrication, epoxy painting, piping and wiring carried out under factory conditions and inspected before dispatch.
The unit can be lifted and moved if site use changes — valuable for construction-phase plants and leased premises.
Available from 10 KLD single compact skids to 150–200 KLD multi-module installations.
FRP and RCC construction also offered where site conditions favour them.
Tell us your flow and footprint — we'll confirm the right sizing.